Bathroom Patch Job
Temporary fix for water damage in a poorly designed bathroom
Living with a poorly designed bathroom can be frustrating and annoying, but a poorly built bathroom can cause a whole other set of problems. Our main bathroom was small and cramped, but we learned to live with it with the expectation that we would someday replace it with a larger one. However, before that day would come, I would have to address some water damage. This fix was neither pretty nor permanent, but it was the easiest, most cost effective solution.
The previous owner of our house sacrificed an 10x12 bedroom to create a main bathroom and an ensuite bathroom. The space the original bathroom occupied was incorporated into a larger master bedroom. The new main bathroom was small but functional. Unfortunately, it was also a poster child for how not to renovate a bathroom.
One day, I was cleaning the grout around the tub when I noticed a loose tile. It did not take much persuasion to remove the tile and reveal the mess that was behind it. This is what I learned about my bathroom upon further investigation:
- Original walls had not been removed. Drywall was simply installed over the old walls. (To me, when going to the expense of new walls and tiles, it only makes sense to gut everything to the studs to upgrade the insulation and make sure there are no other problems)
- Plumbing for the tub wass on an outside wall. There wass minimal insulation (less than R-12) with kraft paper facing, but no other vapour barrier. It's surprising that the pipes hadn't frozen.
- The walls were standard drywall (not even blue board). Cement board should have been used in this wet zone.
- There was no silicone around the tub at all. The gap between the tub and the tile was filled with grout.
- Did I mention that the plumbing was on an outside wall?
My quick fix (and keep in mind that this was only temporary) involved removing the worst of the wet drywall (both layers) exposing the studs. I attached some strapping across the studs and installed 3/8" plywood to patch the hole. I then installed a piece of Barker tile board over the plywood and sealed all the seams with silicone.
It's not the best looking repair in the world, but I am confident that no water is getting through any of my work.
Someone with more talent and experience could have possibly saved the tiles and reinstalled them on the new backer, but that would have taken at least two days for the tile to set and then to apply the grout. My solution allowed same-day use of the tub and shower (at least in theory).
You may notice that the tile board is in two pieces. This is because I did not realize at the time that the tub spout simply unscrews from the pipe. Therefore the repair could have been much cleaner with a hole drilled for the pipe instead of cutting the tile board in two pieces to fit around it.
So, how did this half-arsed repair stand up? The bathroom was gutted about four years later and there was no further water damage to the wall, and no evidence of any water getting behind the wall. I guess I can take credit for a successful repair, despite its ugliness.
Project completed in 2005






Replacing a screen
door on the garage with a steel entry door required installing a completely
new frame.
A 24 inch door
on a five foot wide closet just wasn't practical. Widening the doorway
and installing bifold doors allowed full use of the closet space.
A wood fence with
an uncommon design. How to build a fence using as few screws and nails
as possible.
A bathroom
makeover on a budget. Sure, elements may still be stuck in the fifties,
but they are easier to live with. Besides, you never know when peach and
blue tile will be back in style!
A complete
gut and remodel of a subterranean living space from start to finish.
How an ill-fitting
switch plate led me to gut a room to the studs.
The old deck
railing was too short so I replaced it. The new stairs and railing are
sturdy and look good.
A
temporary fix for a water damaged bathroom wall. It ain't pretty, but
it prevented further damage until we could afford a complete remodel a
few years later.
The second floor
was already finished when we moved in, but improper insulation and electrical
issues led me to completely gut it and start over from scratch. Properly
finishing the attic in a one and a half storey house..
How we rebuilt
our house from the inside out after some bad DIY by the previous owner
compromised the structure.
Complete professional kitchen remodel that addresses all the design problems of the old kitchen.