The Attic Renovation:
Finishing the second floor of a 1½ storey house.
The Final Results
Finishing the attic, with the exception of building the dormer and upgrading the heating system,, was probably within my abilities as a do-it-yourselfer. Certainly, I have done insulation, electrical and drywall in the past with good results. The project was slowed down mainly due to money and the longer it was delayed, the more frustrated I got. It was necessary to hire the first contractor to build the dormer. The insulation and drywall work he did for us was a bonus. The cost to me out of pocket was not too much more than what another company had quoted a year before for just roughing in the dormer.. Having the work finished by the other contractors in 2009 was a no-brainer. It only took them a couple of days to finish all the trim, hang the doors, install the bamboo floor and repaint.
The bamboo floors were installed the same way as hardwood (nail-down, not floating). The only stipulation is that the bamboo must run perpindicular to the floor joists. I chose bamboo for two reasons: it was something a little different and it is environmentally friendly. It can also be refinished the same as hardwood. I do, however, question its durability, Our floor seems to dent and scratch easily, and the damage doesn't blend in with the character of the bamboo as well as it does with traditional oak floors.. The trim is painted MDF moldings which allowed for simple miter cuts in the corners-- any minor gaps could be filled with caulking. The closets are finished with Closet Maid wire shelving which I installed myself (the instructions are very clear and idiot-proof).
After living in the house for six years, we were finally able to live upstairs. My daughter had a sleeping area set up in the livingroom. Now she has her own bedroom (and it is huge!) We also have a nice guest room for when we have out-of-town guests staying with us. My father-in-law can go upstairs and watch NASCAR while everyone else watches non-NASCAR programming on the main television in the family room. Best of all, there is ample storage for toys, games and puzzles-- things that were cluttering up the main floor for years because we had no place to put them.
The Gallery
The bamboo floor in our daughter's bedroom, the guest room, and access to the side attic:
The finished guest room:
Our daughter's bedroom:
The back dormer area in our daughter's bedroom, the hall closet, and one of the five QuickPort outlets on the second floor:
Project completion dated: Summer of 2009
- « previous
- 1Overview of the general condition of the second floor
- 2The wiring and insulation problems that led to a completely gutting the bedrooms
- 3The proper way to insulate the attic and roof in a 1.5 storey house
- 4Opening up more space by getting rid of the chimney
- 5The construction of the front dormer
- 6Wiring for the future. Electrical, data and voice.
- 7More insulation: adding a thermal break and R=value with polystyrene; addressing suspected vapour barrier deficiency
- 8Project delays, hydronic heating upgrade
- 9
- next »













Replacing a screen
door on the garage with a steel entry door required installing a completely
new frame.
A 24 inch door
on a five foot wide closet just wasn't practical. Widening the doorway
and installing bifold doors allowed full use of the closet space.
A wood fence with
an uncommon design. How to build a fence using as few screws and nails
as possible.
A bathroom
makeover on a budget. Sure, elements may still be stuck in the fifties,
but they are easier to live with. Besides, you never know when peach and
blue tile will be back in style!
A complete
gut and remodel of a subterranean living space from start to finish.
How an ill-fitting
switch plate led me to gut a room to the studs.
The old deck
railing was too short so I replaced it. The new stairs and railing are
sturdy and look good.
A
temporary fix for a water damaged bathroom wall. It ain't pretty, but
it prevented further damage until we could afford a complete remodel a
few years later.
The second floor
was already finished when we moved in, but improper insulation and electrical
issues led me to completely gut it and start over from scratch. Properly
finishing the attic in a one and a half storey house..
How we rebuilt
our house from the inside out after some bad DIY by the previous owner
compromised the structure.
Complete professional kitchen remodel that addresses all the design problems of the old kitchen.